- Development of design documentation: highly skilled designers and technologists will help to develop and calculate the project, offer the best options for technical and technological solutions.
- Manufacturing of products: the equipment is made of quality materials, passes a number of tests and tests for maximum compliance with the standards.
- Installation and commissioning work: the whole chain of operations is performed, which is preceded by the start of the operation of the equipment. It includes: recommendations for the installation room, consumables, assembly, assembly, connection; if necessary, assistance in obtaining permits and certificates.
- Training of personnel for work and service of technological equipment.
- Guarantee and after-guarantee service: the basis of uninterrupted operation of the equipment is its maintenance.
About us
Wide range of services
History
1977
Establishment of JSC TEMP Plant
The start of automated lines’ production for the producing of printed circuit boards (using the method of screen print).
80's
New achievements
Development of the method of manufacturing printed circuit boards on silicon organic basis by the method of photolithography.
1984
Production of updated lines
Start of production of the updated lines for recovery of spent electrolytes and extraction of non-ferrous and precious metals.
1986
Employees
The maximum number of employees was 5,500.
1998
Cooperation Start
Start of the cooperation with Prokon Company (Austria) as to serial production of welding tables.
2002
New direction
New manufacture direction development, namely, Galvanic equipment.
2007
Production direction development
Production direction development – pipe welding equipment: clamps-up, welding units, pipe facing machines, pipe welding bases.
2009
Certification
Manufacture certification according to the international quality management system ISO 9001: 2008.
2011
Branch of the Department
The Department branch of the KNU Mechanical Engineering Technology was organized at the plant.
2017
Direction development
New manufacture direction development – Equipment for the production of sanitary ceramics.
2018
Certification according to ISO 9001: 2015
Audit conducting and the Certificate of Conformity obtaining.
2019
Improvement
Nowadays, the JSC TEMP Plant, follows the European way of development, carries out modernization and technical re-equipment of production, and improves technological processes. The company is increasing production and sales cooperating with foreign partners.
2020